High Power Solar Aluminum Lamp with USB Charging Interface COB Emergency Light

Short Description:


  • Trade Terms: FOB, CIF, CFR or DDU, DDP
  • Payment terms: TT, Western Union, Paypal
  • Supply Ability: 10000 Piece/Pieces per Month
  • Delivery for samples: 5-7 days
  • Shipping Way: By sea, By air or By express
  • Product Detail

    Product Tags

    Overview

    Basic Specification

     

    Battery 6V/4.5Ah Parts With multi-function USD connectors
    Working Hour 12-15 hours for high power and 20-25 hours for lower power
    Function With the function of FM radio, SD card, USD connector, USB Charger for mobile
    Charging Time 8-10 hours by AC power
    Warranty and Delivery

     

     

    Selling Unites: Single Item

    MOQ: 1000 pieces for each model

    Customization: Customized Logo -1000 pieces / Customized Package- 10000 pcs

    Production time: 5-7 days for samples / 10-15 days for standard orders

    Warranty: 2-3 years

    Feature

     

     

    1. solar panel to charge the light by sun light
    2. LED bulb lights with cable which can take power from the main light
    3. USB cable with 10 adapters which can take power from the main light to charge mobiles and other devices
    4. cable with plug with which the main light can be charged with 85-265v AC power supply

    High power 10w solar aluminum lamp with USB charging interface automatic COB emergency light

    Our Service

     

     

    1. Reply in 24 hours.

    2.Professional staffs answer all the questions.

    3.Customized Design with OEM or ODM are welcomed.

    4.Exclusive and unique solution can be provided by professional staffs.

    5.The Latest style, High quality and suitable price

    About Us
    1

     

     

    Our company is a private limited company registered in Shanghai, China. It specializes in the R&D, design, manufacture, and marketing of light emitting sources and lighting fixtures. It is an enterprise formed by four (4) pioneer lighting companies, putting their resources together to produce products and services that create sustainability not only for the environment, but also for the economies and societies that the company grows with.

    Package
    包装
    Shipment
    shippment

    The prepare time for item is around 10-15 days. All the items will be test before shipment.

    All the goods are sent from China for now.

    All the order will be shipped by DHL, TNT, FedEx, or By sea, by air etc.  Estimated Time of arrival is 5-10 days by express, 7-10 days by air or 10-60 days by sea.

    05-TRI-PROOF
    FAQ

     

     

    Q: How to find us?

    A: Our email: sales@aina-4.com or whatsapp / wiber: +86 13601315491 or wechat: 17701289192

     

    Q: How can I get the sample to check your quality?

    A: After price confirmation, you can require for samples to check. The samples fee you paid will be return to you when there is formal orders step by step.

     

    Q: How can I get your price?

    A: We will send you quotation within 24 hours after getting your inquiry. If you need price urgent, you can find us any time by whatsapp or wechat or viber

     

    Q: What is your delivery time

    A: For samples, normally will take around 5 days. For Normal order will be around 10-15 days

     

    Q: What about the trade terms?

    A: We accept EXW, FOB Shenzhen or Shanghai, DDU or DDP. You can choose the way which is the most convenient or cost effective for you.

     

    Q: Can you add our logo on the products?

    A: Yes, we can offer service of adding customers’ logo.

     

    Q: Why Choose us?

    A: We have three factories in different places focusing one different type of lights. We can offer more lighting choices for you.

    We have different sales office, can offer you more Awesome services.


  • Previous:
  • Next:

  • Write your message here and send it to us